+234 803 342 5462 Mon–Fri 8:30–17:30 · Sat–Sun off chicotechs1@gmail.com

SCALE &
PRECISION.

10K+ Tons Erected
ZERO Incidents
150+ Active Sites
Industrial storage tank scaffolding
Industrial

Refinery Storage Tank Access

Full Perimeter 6 Weeks

Independent system scaffolding erected completely around a large cylindrical industrial storage tank, providing multi-level access for welders and painters to perform abrasive blasting and recoating.

Ship hull dry dock scaffolding
Industrial • Marine

Dry Dock Vessel Access

Ship Hull Access Zero Incidents

Rapid-deployment heavy-duty scaffold erected around a massive red vessel hull in a dry dock. Engineered to follow the contour of the ship, allowing shipwrights to complete extensive hull repairs safely.

Residential low-level scaffolding
Residential

Residential New Build Phase

Brickwork Access 12 Weeks

Standard independent tied tube-and-fitting scaffold for an active residential block development, featuring loading bays for heavy masonry materials and full edge protection for the bricklayers.

Industrial pipework scaffolding
Industrial

Industrial Pipework Insulation

2.5kN/m² Loading 8 Weeks

Bespoke access scaffold woven safely through and around large-diameter live silver industrial pipework, enabling engineers to strip and replace thermal insulation on elevated pipeline runs.

Offshore platform rigging
Industrial • Offshore

Offshore Security Rigging

Over-water Access Specialist Team

Specialized scaffold structure cantilevered directly over the ocean from an offshore rig platform, allowing technicians in safety harnesses to securely install heavy-duty concertina wire security barriers.

Offshore rig structure scaffolding
Industrial • Offshore

Offshore Deck Extension

Slung Scaffold High Wind Loading

A complex slung scaffold suspended beneath the yellow structural members of an active offshore rig over bright blue ocean waters, providing secure under-deck footing for welders working on structural extensions.

Commercial high-rise scaffolding
Commercial

High-Rise Commercial Build

Multi-Story Crane Coordinated

Extensive perimeter system scaffolding encapsulating a large multi-story commercial building under construction. Designed to integrate seamlessly with active yellow tower crane operations and material loading schedules.

Ready to discuss your project?

Get a Scaffold Quote